Galvanised Bridge Rails for Davbridge Constructions

Galvanised Bridge Rails

Davbridge Constructions have contracted Neumann Fabrications for the steel fabrication of 740 metres of Bridge Traffic Rail and 370 metres of Balustrade for three bridges on their Lake Kawana Boulevard Project.

Steel fabrication is well underway, and currently, Neumann Fabrications is getting ready for the first site delivery of 270 metres of Bridge Traffic Rail for the first bridge.

DESCRIPTION: Construction of 2 new Dual carriageway pedestrian bridges and refurbishing the existing 130-meter long eastern bridge. The new bridges consist of a 5 span 130 meters long and 3 span 75-meter long dual carriageway plus pedestrian walkway bridges.

LENGTH: 130 meters and 75 meters, respectively.

Neumann Fabrication is a division of Neumann Contractors Pty Ltd, which is based on the Gold Coast, Australia and forms part of the Neumann Group of Companies. The Company has more than 60 years of experience in metal fabrication projects.

Scroll to Top