Fabrication
Projects


Exceeding Expectations, One Project at a Time!
Image

Palm Beach to Tugun (PB2T) – Pacific Motorway Upgrade


Neumann Contractors is proud to have played a key role in the successful delivery of the Palm Beach to Tugun (PB2T) section of the M1 Pacific Motorway upgrade – the third and final stage of the Varsity Lakes to Tugun (VL2T) program.

Visit Project
Image

Salisbury Station Upgrade – Cross River Rail


Full scope steel fabrication including 55m pedestrian footbridge, lift shafts, and platform canopies for the Cross River Rail project.

Visit Project
Image

Kangaroo Point Green Bridge


We are proud to have played a key role in the construction of the Kangaroo Point Green Bridge, delivering the architectural steelwork package for this landmark project.

Visit Project
Image

Floating Electric Booster Pump


This project for an international client in Saudi Arabia involved the complete design and manufacture of a floating booster pump station, highlighting our end-to-end capabilities in dredging equipment.

Visit Project
Image

Mayne Stabling Yard Security Fencing


The Mayne Stabling Yard Security Fencing project for Queensland Rail, undertaken by Neumann Fabrication, involved the supply, fabrication, and protective coating of steel fencing and related components. Collaborating closely with Fencepac…

Visit Project
Image

Cross River Rail – Roma Street Station Platform 2


A complex public infrastructure project that required manufacturing 100 tonnes of structural steel, including cambered UC trusses, to construct the platform canopy structure.

Visit Project
Image

Fabrication of Variable Message Sign Steel Structure


The manufacture of a Type C Variable Message Sign Structure for J1 LED, which will be placed on the Pacific Highway at Springwood. Supply, fabrication and galvanising of a steel structure to suit type C variable message sign, consisting of gantry column…

Visit Project
Image

V1 Veloway Bridge Gantry – Fabricated Steelworks


The gantry was Stage D of the V1 Veloway Bikeway Project and created access over Juliette Street and a section of bikeway from Cornwall Street to O’Keefe Street.

Visit Project
Byron Bay Bus Interchange Canopy Steelwork

Byron Bay Bus Interchange Canopy Steelwork


This project consisted of 80 tonnes of complex heavy steel box columns and rafters, including custom perforated screen panels that showcase our architectural fabrication capabilities.

Visit Project
Image

South East Freeway Cycleway Project Steelwork


The Queensland Government Department of Transport and Main Roads (TMR) has been constructing cycleway infrastructure to connect the Brisbane Central Business District (CBD) and Eight Mile Plains since 1993.

Visit Project
Image

Gateway Merge Upgrade – Steel Gantry Fabrication


For this project, we fabricated and installed seven cantilevered VMS gantries, two large portal frame gantries, and bridge-mounted Lane Use Management System (LUMS) bracket steelwork.

Visit Project
Image

Arrival Pontoon Structure


Neumann Contractors were engaged as the fabrication contractor to carry out the fabrication and Coating of the Arrival Pontoon Structure at the One and Only Resort Hayman Island. This project consisted of seven 1.4 m diameter rolled plate chambers coated inside…

Visit Project