Fabrication Projects

South East Freeway Cycleway- Veloway V1 Stage E

The Queensland Government Department of Transport and Main Roads (TMR) has been constructing cycleway infrastructure to connect the Brisbane Central Business District (CBD) and Eight Mile Plains since 1993.

Byron Bay Bus Interchange Canopy Steelwork

The new Interchange at Byron Bay is part of the Transport Access Program (TAP). The new Interchange is constructed at a location along Butler Street, adjacent to the rail corridor.

Worongary to Robina M1 Upgrade

The M1 upgrade between Worongary and Robina was part of the Pacific Motorway M1 Upgrade Program.

V1 Veloway Bridge Gantry

The gantry was Stage D of the V1 Veloway Bikeway Project and creates access over Juliette Street and a section of bikeway from Cornwall Street to O'Keefe Street.

Gateway Merge Upgrade

M1 M3 Gateway Merge Motorway Upgrade - Neumann Fabrication was engaged to provide Visual Messaging Structure Gantry Fabrication and Installation for Lendlease Engineering.

Lagoon Creek Cycle Bridge

Fabrication of a steel bridge structure and hand rails

5km Pipework for Fuel Pumping Line

Fabrication and Welding of Petroleum Pipeline

Rio Tinto Alumina – Yarwun 2 Extension project

Fabrication of Launder Assemblies & Ancillary Tank

Steve Irwin Way Bridge – Traffic Rails and Anchorages

Fabrication of Bridge Traffic Rails

Static Sign Structures

Static Sign Structures (Cantilever & Portal Structures)

Scroll to Top
Head Office

Visit the websites above for more detailed information on our services.